Missing vs Zero in PV Monitoring Exports
How to check missing intervals without treating them as measured zero generation.
Read the noteFor O&M leads and installers taking over rooftop PV portfolios
Get a written list of data gaps by site. I check your site and device register against monitoring exports for a 30-day window.
Try an example, or check a solar monitoring export for one site and one data source. The file and result stay in your browser.
Email the site count and portal names. No files needed. I reply in writing within two working days. oleksii.shevchenko@shevsoftware.com
Fictional example · Not customer data
The portal can list a site as reporting even when some records are missing.
Four sites in this example had gaps the portal overview did not flag.
Portal access and site lists can lag behind a handover. If an authorised portal inventory is available, I check which sites and devices it lists. An export alone cannot confirm a site is missing from the portal. Unclear mappings, filters or reporting rules stay unresolved. The check covers historical records.
THE SNAPSHOT
The Snapshot checks one 30-day window. Your written report shows where records are missing, stale or inconclusive, with evidence for each site.
Read-only. Includes a written report, one round of written questions and answers, and one correction if I got something wrong on the inputs we agreed.
Up to 10 sites · 2 portals · 30 days
One window you choose — for example the month before handover.
10 working days
Ten working days start once complete inputs and a reserved slot are agreed. The scope is fixed; if your data needs more than it covers, I say so before starting.
On requestafter a sample export check
I send the quote and payment terms in writing before work starts. SHEV Software (Poland) issues the invoice.
Your site register, plus exports or read-only access
An exception list per site
No visits. No diagnosis. No monitoring.
I tell you which sites are silent — not why.
After the Snapshot: if the list is useful, the next step is a full Fleet Blind-Spot Audit — 20–200 sites, up to three portals — scoped and priced from what the Snapshot found.
WHAT A FINDING LOOKS LIKE
Seven fictional rooftops, two portals, the 30 days before handover. The overview showed no alerts. The Snapshot compares the records each site was expected to send with what arrived.
S-07 Plant Two · Portal A
Fictional example. The gap shows missing records. Whether the inverter produced power remains unknown.
| Site | Portal | Last record in window · UTC | Expected frequency | Snapshot status | Gap age at window end |
|---|---|---|---|---|---|
| S-01 Warehouse North | Portal A | 2026-10-24 17:45Z | 15 min | Reporting | — |
| S-02 Logistics Hub | Portal A | 2026-10-13 09:15Z | 15 min | Silent | 11 days |
| S-03 Retail Park B | Portal B | 2026-10-24 17:30Z | 15 min | Reporting | — |
| S-04 Cold Store | Portal B | 2026-10-21 12:00Z | 15 min | Stale · partial days since 2026-10-19 | 5 days |
| S-05 Office Roof | — Not in any portal | — | daily | Missing from both portals | whole window |
| S-06 Depot East | Portal A | 2026-10-24 17:45Z | 15 min | Reporting | — |
| S-07 Plant Two | Portal A | 2026-10-24 17:45Z | 15 min | Reporting · inverter 3 of 4 absent since 2026-10-19 | 5 days |
Two cases the portal overview does not show. S-05 Office Roof was commissioned but never mapped into a portal, so no portal overview lists it; it has no records for the whole window. S-07 Plant Two still reports, but one of its four inverters has sent no records since 19 October — 5 days at the end of the window. Whether a given portal would alert on that depends on the portal; this fictional example does not establish it.
In this example the portal overview showed 0 alerts, yet 4 of the 7 sites have a gap. One of them, S-07 Plant Two, is still listed as reporting because only one of its four inverters stopped sending records.
The Snapshot cannot establish why a site is silent — communications, inverter, portal mapping — or what the lost yield is worth. It establishes which sites, since when, and what was visible meanwhile.
HOW A SNAPSHOT RUNS
Email the number of sites and the portal names. I reply in writing within two working days — a reply, not a decision on your data. We then agree whether to use exports or read-only access. Before any work starts, I check a sample export for suitability and confirm the window, the reserved slot and the quote in writing.
What to send in the first emailYou share exports or create a temporary read-only viewer role. I compare your register, how often each site should report and the records that arrived, portal by portal. Nothing is changed and nothing is controlled.
You receive the per-site list, the evidence behind each finding, and an explicit list of what the data could not show. Access is revoked and exports are deleted 30 days after delivery.
WHO DOES THE WORK
I’m Oleksii Shevchenko, a senior Go backend engineer based in Poland. I build data pipelines and run Enerplain as part of SHEV Software.
My work covers the data check and written follow-up. Maintenance and hardware are outside the service.
No. One 30-day window, checked once, delivered once. No dashboard, no alerts, no control of any system. If you want it repeated, that would be a separate scope, agreed in writing after the first list.
There is no universal portal compatibility, and I claim no verified support for any specific OEM. It works where a portal offers a viewer role or a CSV/XLSX export carrying site, timestamp and energy columns — I check a sample of your actual export before committing. The first Snapshot covers two portals; a portfolio on more portals goes into the full audit.
No. A temporary read-only role created for the Snapshot and revoked afterwards, or exports. Never send passwords, customer identifiers or raw telemetry by email — the first email needs only the number of sites and the portal names. Once the scope is agreed, what I need is the site and device register, the exports themselves, and which portal and export produced each file.
Why a site is silent, whether equipment is faulty, or the value of lost yield. This is not electrical diagnosis, performance certification or energy-savings verification. A gap is a gap in the evidence: records did not arrive at the frequency we agreed. By itself it does not mean a fault — a communications link, a data logger, a portal mapping or the export itself can produce the same silence.
FIELD NOTES
Short, practical notes for people who read PV data, not just dashboards. Current notes are in English.
How to check missing intervals without treating them as measured zero generation.
Read the noteUTC, local offsets and a daylight-saving change in a PV export.
Read the noteA compact source-to-application review checklist for technical teams.
Read the noteREQUEST A SCOPE
That is all the first email needs. Please attach nothing and send no credentials or customer data. I reply in writing within two working days — a reply, not yet a commitment. Exports or read-only access, the window and the quote are agreed afterwards, in writing.
Request a scopeoleksii.shevchenko@shevsoftware.com
Your mail app will open. Correspondence in English; Ukrainian and Russian on request. Delivered remotely from Poland.